Resource Statement

Project Measured Indicated Inferred Total Gold Oxide Gold
Karaağac 0 0 157,000 157,000 0
Altιntepe* 212,352 255,392 125,387 593,131 336,915
Muratdere** 0 0 204,296 204,296 0

 

* The resource at Altιntepe also includes 2,371,689 oz oxide silver (Ag), and a further 812,819 oz Ag in sulphide material.

** The resource at Muratdere also includes 186,000 tonnes copper (Cu), 3.9 million oz Ag, 6,390 tonnes molybdenum (Mo), and 17,594 kg Rhenium (Re).




designed and produced by fresh01.com